Tank battery and pad construction in the North Dakota badlands, with excavators, a crane and pipe staged on red scoria
Specializing in methane pipeline from start to finish

Pipeline & Excavation Contractor for the Bakken and the Black Hills

Eaton Construction builds methane and oilfield pipeline from start to finish: poly and steel mainline, gathering systems, plant work, bores and repairs, plus the hydrovac, dirt work, welding and trucking around them. Headquartered in St. Onge, SD, with a shop in Watford City, ND.

2006Founded in the
Powder River Basin
2011Building in the Bakken
In-HousePoly fusion & trucking
MSHA · OSHAEvery employee
trained & certified
About Eaton Construction

Getting Your Project Done Right

You can trust Eaton Construction when it comes to your construction and pipeline needs. We cross-train all of our employees, give them up-to-date equipment, and stress safety and quality to achieve each project's specific goals.

Eaton Construction LLC is a pipeline and excavation contractor founded in 2006 and led by owner Wayne Eaton. The company started in the Powder River Basin coalbed-methane field and has worked in the North Dakota Bakken since 2011, when it built a shop with living quarters in Watford City. Its headquarters is in St. Onge, South Dakota.

Wayne Eaton brought 20 years of experience in water lines, excavation and poly pipe to the company, and he is on the job site every day. That means the person who bids your job is the person who answers for it in the field.

  • In-house HDPE fusion. We fuse all of our own mainline poly pipe, in all sizes, with a McElroy MFT 20 Fast Fusion machine.
  • Steel, fiberglass and poly. Gathering systems, flowlines and water transfer lines, built to the operator's spec.
  • Supervised, cross-trained crews. Every employee is fusion-certified and MSHA/OSHA trained; new hires don't fuse unsupervised for 60 days.
  • Our own trucks, hydrovac and rock saw. The equipment to finish the job without waiting on anyone else.

More about our company →

How a job runs

From Bid to Backfill

  1. Scope & Bid

    Send us the route, footage, pipe spec and timeline. An owner reviews it and walks the route when needed.

  2. Locate & Prep

    811 locates, right-of-way clearing, staging and pipe delivered on our own trucks.

  3. Build

    Trenching, fusing or installing steel and fiberglass, tie-ins and crossings.

  4. Test & Restore

    Pressure testing, backfill, cleanup and reclamation, then hand-off documentation.

FAQ

Frequently Asked Questions

What does a pipeline contractor do in the Bakken?

A pipeline contractor builds the lines that move gas, oil and water between wells, pads, compressor stations and disposal sites. That covers clearing the right-of-way, trenching, stringing pipe, fusing or welding joints, tie-ins, pressure testing, backfill and reclamation. Eaton Construction does all of it with its own crews, fusion equipment and trucks.

What areas do you serve?

Western North Dakota — Watford City, Williston, Alexander, Arnegard, Keene, Killdeer and the rest of McKenzie, Williams and Dunn counties — from our Watford City shop. Western South Dakota — Belle Fourche, St. Onge, Spearfish, Sturgis, Whitewood and Newell — from our St. Onge office. Ask about projects outside those areas.

Are your crews safety trained?

Yes. All Eaton Construction employees are MSHA trained and OSHA certified. We hold daily tailgate safety meetings and do daily equipment inspections, and both are documented. Hard hats, steel-toe boots and safety glasses are required, and most of our employees have been with us for five years or more.

What do you need from me to put together a bid?

The location (legal description or GPS is ideal), the footage, the pipe material, diameter and pressure rating, any drawings or specs, crossings such as roads or other lines, and your target start date. Send what you have; we will ask for the rest.

Who will actually be on my job site?

Our owner. Wayne Eaton is on the job site every day for quality control, and our crews are cross-trained across fusion, equipment and trucking. All employees are fusion-certified, and new employees don't fuse unsupervised for sixty days, even after certification.

Have a Line to Lay or Ground to Move?

Send us the scope: footage, pipe size and location. An owner will call you back.

Get a Personalized Quote